Negotiating the Build-to-Suit Lease (OnDemand Webinar)

$199.00

SKU: 408343EAU

Description

Learn how to address and negotiate the unique issues that arise in buildtosuit leases.Buildtosuit leases present different issues from typical leases of existing space and buildings. In most leases, the building is already in place, and the additional required work to prepare the premises for the tenant’s use consists of mostly interior improvements or will be undertaken by the tenant itself. In a buildtosuit lease, the building may not yet be constructed, or the landlord will take on substantial work to renovate significant portions of the property and the building to accommodate the particular tenant’s use, or the landlord will be solely responsible for all interior improvements and the risks as to the cost of the same. The parties are sometimes working from preliminary plans in negotiating the development of the space or the entire site. Buildtosuit tenants are often seeking to take space to meet a key business need or to consolidate functions, and as a result, the timing of completion is critical. As a result, the parties need to clearly understand the factors which could affect the timeline for construction, completion, and occupancy. During the COVID19 pandemic, certain construction and permitting impacts were experienced as well as the potential for changed needs. This topic will address some of the key elements necessary to assure that the unique issues of buildtosuit leases are adequately addressed in the lease and the negotiations leading to the lease.

Date: 2021-04-21 Start Time: End Time:

Learning Objectives

Key Issues in Build-to-Suit Leases

Timeline
• Entitlements, Permits, Demolition of Existing Structure and Plan Status
• Timing for Preparation of Construction Drawings and Building Permits
• Key Contingency Dates
• Resolving Construction Period Issues
• Potential Impacts of COVID-19 on Timeline

Cost Factors
• Use of Maximum Allowances to Control Changes
• Determination of Rent in Reference to Build-to-Suit Costs, or Fixed Rent
• Extension Option Rent

Delivery of Premises
• Early Delivery of Portions of Building to Meet Tenant Start Needs
• Delays in Delivery and Remedies
• Non-Landlord Delays: Force Majeure, Tenant Delay, Permitting, COVID-19

CLE (Please check the Detailed Credit Information page for states that have already been approved) ,Additional credit may be available upon request. Contact Lorman at 866-352-9540 for further information.

Kenneth S. Kramer-Nossaman LLP